Chimney Flashing: Repair or Replace? A Plain-English Guide
Chimney flashing can usually be repaired when the metal is sound and the problem is a small gap, a failed sealant

Author
Owner & founder, Total Roof Protection
Jeremy founded Total Roof Protection in Oklahoma City in 2020. Before roofing he trained as a welder and worked in the oil field, and when COVID shut that work down he moved to OKC and built the company from scratch.
Today Total Roof Protection is an insurance-restoration roofing company serving the OKC metro. Jeremy and his crews help homeowners through hail and storm damage, roof inspections, repairs and replacements, and the insurance claim process from first inspection to final invoice.
Outside the company he founded Arrive by 25, a six-month sales training program for young adults launching in February 2027, and serves as treasurer of the Oklahoma Phoenix Project, a 501(c)(3) serving OKC's homeless community.
“We don't sell shingles. We sell outcomes.”
Chimney flashing can usually be repaired when the metal is sound and the problem is a small gap, a failed sealant
Architectural vs 3 tab shingles comes down to construction and look. Architectural shingles (also called dimensional or laminated shingles) are built
To vet a roofer after a storm, verify who they are, what they carry, who stands behind the work, and what
A roof replacement estimate is a best reading of a roof you can only partly see. The shingles are visible from
Solar panels and roof replacement have to be planned together, because the panels sit on the roof and the roof sits
A new roof usually comes with more than one warranty, and they are not the same thing. The manufacturer's warranty is
Selling a house with an old roof is possible, but the roof will almost certainly come up during the sale: in
Roof ventilation is a planned path for air to enter the attic low on the roof and leave it high on
A low slope roof sheds water slowly, and standard shingles depend on water moving off quickly. Once the pitch gets shallow
The roof replacement process runs in eight stages: inspection, estimate, scheduling, materials delivery, tear-off and decking repair, installation, cleanup, and a